3714 Harvey Penick Drive, TX 78664
Stay connected:
Structural-Stress-Analysis-For-Waste-Heat-Recovery-Units-Using-STAAD-Pro.jpg

Description

Client

The client is a large EPC conglomerate based in the UK who has executed construction projects in a myriad of industries, ranging from commercial infrastructure to heavy industrial and energy sectors.

Engineering Requirement

Rishabh Engineering was responsible for the following:

  • Preparation and Collation of all engineering data regarding the design and fabrication of WHRUs
  • Structural analysis of two nos. WHRU using STAAD.Pro v8i
  • Foundation load data calculation and anchor bolt design
  • Structural analysis during a lifting operation of various WHRU components
  • Structural analysis during the transportation operation of various WHRU components
  • Structural analysis for WHRU support and associated pipe supports
  • Structural analysis of supporting platform
  • Structural design drawings for WHRU support, pipe supports and supporting platform
  • Carry out a detailed review of fabrication drawings based on structural design drawings

Delivered

  • Structural Stress Analysis Report
  • Lifting and Transportation Analysis
  • Foundation Load Data
  • Structural Design Drawings
  • Review of Fabrication Drawings

Want to know more about this project?

Ready to work with us? Tell us more

    Yes, I am OK to receive further communication over my details shared here.Refer privacy policy for more info.

    Our Recent Blogs

    Equipment Symbols In P&IDs

    P&ID Equipment Symbols: Essential Components of System Design

    In this blog, we’ll explore the frequently used equipment P&ID symbols, while explaining their function, significance, and how they contribute to effective system design.
    P&ID Instrument Symbols and Their Identification

    Understanding P&ID Instrumentation Symbols

    This blog will dive deep into P&ID instrument symbols, explaining what they are, their importance, components, the types of symbols used, and how to interpret them and how Rishabh Engineering integrates these standards to ensure efficient, safe, and compliant designs for process systems.
    Piping and Instrumentation Diagram Symbols For Pumps

    P&ID Symbols For Pumps: Process Engineers’ Guide

    This blog takes a deep dive into P&ID pump symbols — what they are, how they are used, why they are important, how to read and interpret them along with guidelines and best practices for creation. For engineers, designers, and operators alike, understanding pump symbols is critical to both interpreting and developing process designs that are safe, functional, and compliant with industry standards.