
Project Information
Early Production Facility and the associated Central Tank Battery (CTB) Facility
Description
Client
A US based privately held Engineering, Procurement, Construction & Project Management company specializing in construction of heavy industrial facilities and pipelines. The company has extensive experience with oil terminals.
To get detailed information

Engineering Requirement
3D modeling and piping engineering of an Early Production Facility and the associated Central Tank Battery (CTB) Facility. Following equipment had to be modeled as a part of the project:
- 22 Storage Tanks – Test oil, Water and Oil
- Three Phase Separators (1 Vertical + 1 Horizontal)
- 1 vertical Two Phase Separator
- 1 Heater Treater
- 3 Fuel Gas Scrubbers
- 2 Knock Out Drums
- 1 Flare Stack

Delivered
- Final 3D Model
- Key Plan Layout
- Site Layout
- General Arrangement Drawings
- Isometrics Views
- Bill of Material (BOM)
Want to know more about this project?
Our Recent Projects
Connect with us for all your engineering design needs
US Toll-Free Phone
+1-877-747-4224
India Phone
+91 (265) 2680159
Drop Us An Email
sales@rishabheng.com
Our Offices
USA, UK & India (Head office)
Ready to work with us? Tell us more
Our Recent blogs
Finding tools that simplify and improve the accuracy of the design and analysis process is crucial when selecting the best structural engineering software. Engineers can work more quickly, with limited to no errors, while building sturdy, secure structures with the aid of the leading software. We'll examine some of the best choices that can elevate your efforts in this part.
In this article, we explore the fundamental role of process engineering in petrochemical industry and how Rishabh Engineering’s process engineering discipline experience helps companies meet the ever-evolving challenges of the sector.
In this blog, we’ll discuss the specifics of coal gasification plant design, including components, considerations, benefits along with potential challenges and how Rishabh Engineering can help solve them with multidiscipline design engineering.