
Project Information
Piping Stress Analysis and 3D Modeling for Flare Package of Refinery with Structural Support Design
Description
Client
A leader in combustion engineering with over 25 years of project package supply expertise, the client provides full design, manufacturing, erection and commissioning services for flare system for oil & gas refinery, petrochemical, fertilizers, steel plants, and allied chemical Industries.

Engineering Requirement
- Develop an intelligent 3D Model using PDMS and Piping Stress Analysis Report (Intergraph CAESAR II) with all the engineering deliverables required for erection & construction with support design
- The scope covered 3D modeling of all major disciplines like piping, mechanical equipment and civil & structural

Delivered
- Final 3D model
- Isometric drawings
- Consolidated Piping – MTO
- Model review files on every fortnight bases for client to review
- CAESAR (.C2)File
- Stress Reports
- Support Drawings
- MTOs
Want to know more about this project?
Our Recent Projects
Connect with us for all your engineering design needs
US Toll-Free Phone
+1-877-747-4224
India Phone
+91 (265) 2680159
Drop Us An Email
sales@rishabheng.com
Our Offices
USA, UK & India (Head office)
Ready to work with us? Tell us more
Our Recent Blogs
In this blog, we will explore the P&ID Valve symbols — what they are, how they are used, why they are important, and how to read and interpret them, along with best practices for reading these symbols effectively.
This article will go over the different aspects of onshore upstream facility design, its components, key considerations, along with potential challenges and best practices.
This blog takes a deep dive into P&ID vessel symbols — what they are, how they are used, why they are important, and how to read and interpret them. For engineers, designers, students, and operators alike, understanding vessel symbols is critical to both interpreting and developing process designs that are safe, functional, and compliant with industry standards.