
Project Information
Piping Stress Analysis for vacuum heater and support in planning for process & boiler feed water coils.
Description
Client
A leader in providing quality heat transfer equipment like direct fired heaters, air preheat systems and water heat recovery systems. They innovate their designs to save fuel, matching the customer specifications, and optimize to accommodate special project requirements.

Engineering Requirement
- Piping Stress Analysis as well as support in planning for process & boiler feed water coils
- Flexibility analysis on the process coil of radiant and convection process piping
- Flexibility analysis on the boiler feed water coil
- Support for the horizontal radiant single fired tubes in coking service
- Analysis and evaluation of the 5” lower radiant tube for the effects of bowing associated with the temperature differential

Delivered
- Piping Stress Output for 4passes & Boiler feed water line
- Piping Stress Reports
- Assumptions & considerations & with suggestions reports
- C2 file
- Simplified report for support design (Induced forces, moments & displacements at support locations in
simplified manner)
Want to know more about this project?
Our Recent Projects
Connect with us for all your engineering design needs
US Toll-Free Phone
+1-877-747-4224
India Phone
+91 (265) 2680159
Drop Us An Email
sales@rishabheng.com
Our Offices
USA, UK & India (Head office)
Ready to work with us? Tell us more
Our Recent Blogs
In the complex world of process industries, effective communication and documentation are crucial for ensuring safety, efficiency, and successful operation. The Piping and Instrumentation Diagram (P&ID) is vital in this domain. With this article, we will explore what is P&ID, its significance across diverse industries, the symbols employed, and a comprehensive guide on crafting them.
In this blog, we’ll explore the frequently used equipment P&ID symbols, while explaining their function, significance, and how they contribute to effective system design.
This blog will dive deep into P&ID instrument symbols, explaining what they are, their importance, components, the types of symbols used, and how to interpret them and how Rishabh Engineering integrates these standards to ensure efficient, safe, and compliant designs for process systems.