3714 Harvey Penick Drive, TX 78664
Stay connected:
effluent-treatment-plant.jpg

Description

Client

A leader in water technology market and holds global market share of 14%. They offer services in the areas of municipal and industrial water & waste-water treatment. They have consolidated its’ specialist reputation through a number of innovative and path-breaking projects in the fields of water treatment and waste-water recycling.

Engineering Requirement

  • PDS Administration including spec. writing (Approx-15 Spec) and customization of special items

Modeling

  • Roads, pavements and storm water drains, process drains and interface junctions, culverts, pits
  • Equipment modeling
  • Equipment foundations / Structure / Structural platforms / Ladders / Railing / Manholes / Envelopes
  • Structural modeling
  • Physical support modeling as per support standards
  • Cable Trays (Electrical & Instrumentation)
  • Instruments, Junction boxes, Air manifolds, SOV boxes, Local Control Panels with supports
  • Motors and PBS with canopy
  • Electrical JBs and DBs, Column or wall mounter electrical supplies, Earthing / Lighting pit location
  • Electrical structural supports
  • As-Built Modeling / Drafting

Delivered

  • Isometric drawings
  • Consolidated MTO (in Excel) – Piping and Structural
  • Piping GA drawings
  • Final 3D model
  • Updated As-Built Drawings

Want to know more about this project?

Ready to work with us? Tell us more

    Yes, I am OK to receive further communication over my details shared here.Refer privacy policy for more info.

    Our Recent Blogs

    P and ID Symbols

    Understanding Different P&ID Symbols for Industrial Processes

    In the complex world of process industries, effective communication and documentation are crucial for ensuring safety, efficiency, and successful operation. The Piping and Instrumentation Diagram (P&ID) is vital in this domain. With this article, we will explore what is P&ID, its significance across diverse industries, the symbols employed, and a comprehensive guide on crafting them.
    Equipment Symbols In P&IDs

    P&ID Equipment Symbols: Essential Components of System Design

    In this blog, we’ll explore the frequently used equipment P&ID symbols, while explaining their function, significance, and how they contribute to effective system design.
    P&ID Instrument Symbols and Their Identification

    Understanding P&ID Instrumentation Symbols

    This blog will dive deep into P&ID instrument symbols, explaining what they are, their importance, components, the types of symbols used, and how to interpret them and how Rishabh Engineering integrates these standards to ensure efficient, safe, and compliant designs for process systems.