3714 Harvey Penick Drive, TX 78664
Stay connected:
checking-of-engineering-drawings.jpg

Description

Client

The client is a world leader in providing water and wastewater treatment solutions for both the public and private sectors.

Engineering Requirement

  • Cross-checking of General Arrangement drawings
  • ISO Fabrication Drawings and Pipe support drawings before issuing to fabricators
  • To check piping line numbers, pipe support tag numbers and equipment tag numbers in GA’s drawings
  • Piping components and BOM in piping fabrication drawings
  • Pipe support components and BOM in piping supports fabrication drawings

Delivered

  • 550+ Drawings Checked
  • Checked Piping Isometrics
  • Checked Piping Support Drawings
  • Checked General Arrangement Drawings

Want to know more about this project?

Ready to work with us? Tell us more

    Yes, I am OK to receive further communication over my details shared here.Refer privacy policy for more info.

    Our Recent Blogs

    Process Engineering Challenges and Their Solutions

    Process Engineering Challenges & How Rishabh Engineering Helps Solve Them

    This blog will explore how multidisciplinary design engineering firms like Rishabh Engineering leverage the full potential of AspenTech tools to tackle modern process engineering challenges with precision, agility, and cross-functional insight.
    P and ID Symbols For Valves

    P&ID Valve Symbols In Process Engineering & System Design

    In this blog, we will explore the P&ID Valve symbols — what they are, how they are used, why they are important, and how to read and interpret them, along with best practices for reading these symbols effectively.
    Onshore Upstream Facility Design

    Onshore Upstream Facility Design Essentials

    This article will go over the different aspects of onshore upstream facility design, its components, key considerations, along with potential challenges and best practices.