
Project Information
Checking of engineering drawings including piping isometrics, general arrangement drawings, ISO fabrication drawings and pipe support drawings
Description
Client
The client is a world leader in providing water and wastewater treatment solutions for both the public and private sectors.

Engineering Requirement
- Cross-checking of General Arrangement drawings
- ISO Fabrication Drawings and Pipe support drawings before issuing to fabricators
- To check piping line numbers, pipe support tag numbers and equipment tag numbers in GA’s drawings
- Piping components and BOM in piping fabrication drawings
- Pipe support components and BOM in piping supports fabrication drawings

Delivered
- 550+ Drawings Checked
- Checked Piping Isometrics
- Checked Piping Support Drawings
- Checked General Arrangement Drawings
Want to know more about this project?
Our Recent Projects
Connect with us for all your engineering design needs
US Toll-Free Phone
+1-877-747-4224
India Phone
+91 (265) 2680159
Drop Us An Email
sales@rishabheng.com
Our Offices
USA, UK & India (Head office)
Ready to work with us? Tell us more
Our Recent Blogs
In this blog, we’ll explore the frequently used equipment P&ID symbols, while explaining their function, significance, and how they contribute to effective system design.
This blog will dive deep into P&ID instrument symbols, explaining what they are, their importance, components, the types of symbols used, and how to interpret them and how Rishabh Engineering integrates these standards to ensure efficient, safe, and compliant designs for process systems.
This blog takes a deep dive into P&ID pump symbols — what they are, how they are used, why they are important, how to read and interpret them along with guidelines and best practices for creation. For engineers, designers, and operators alike, understanding pump symbols is critical to both interpreting and developing process designs that are safe, functional, and compliant with industry standards.