Project Information
Detailed Engineering - Musandam Gas Processing Plant
Description
Client
A leading contracting organization operating in the field of construction and erection for industrial process plants and petrochemical plants.

Engineering Requirement
- Design and Detailed Engineering for 18 Storage Tanks in Musandam Gas Processing Plant

Delivered
- Mechanical design calculations and General Arrangement drawings
- Designed tanks in diameter range of 7M to 51 M and height ranging from 6 M to 22 M
- Detailed drawings for shop fabrication
- Fire Water / Foam Spray / IA line external piping (For only riser pipe & ring pipe)
- Pipe Support Clip Drawings
- API 650, ASME B31.3 codes and standards were followed to ensure high quality of delivery in detailed engineering
Want to know more about this project?
Our Recent Projects
Connect with us for all your engineering design needs
US Toll-Free Phone
+1-877-747-4224
India Phone
+91 (265) 2680159
Drop Us An Email
sales@rishabheng.com
Our Offices
USA, UK & India (Head office)
Ready to work with us? Tell us more
Our Recent Blogs
An aging plant has typically been operating over several decades and is likely to have gone through significant changes. It would range from modifications to expansions and design changes. You would agree as the asset gets older several challenges inevitably arise.
An aging plant has typically been operating over several decades and is likely to have gone through significant changes. It would range from modifications to expansions and design changes. You would agree as the asset gets older several challenges inevitably arise.
An aging plant has typically been operating over several decades and is likely to have gone through significant changes. It would range from modifications to expansions and design changes. You would agree as the asset gets older several challenges inevitably arise.